| Back |
The Move Begins |
|
| Next |
All components were installed to insure we fit under the roof of our new location and then had to be dismantled before the move.
Nate manhandles a 40 foot long skid.
The truck driver and crane operator ease the frame between the narrow space between the two.
A perfect landing for the equipment skid's new home.
The first day and truckload moved. Two more to go! |
|
| <<< | Back to 1000 Hour Page Index |